52古典>英语词典>push over翻译和用法

push over

英 [pʊʃ ˈəʊvə(r)]

美 [pʊʃ ˈoʊvər]

推倒

柯林斯词典

双语例句

  • Push-Over Analysis of Renovated Structures for Seismic Performance Evaluation
    基于pushover方法对改造建筑物抗震性能的评估
  • Through the push over analysis of two tall concrete buildings with different structure types the influence of second order effect on top drift and base overturning moment had been discussed in detail.
    对两栋不同结构体系的高层混凝土建筑进行了推覆分析,详细讨论了二阶效应对结构顶点侧移和基底倾覆力矩的影响。
  • Melendres researches and outlines a report first, then tries to complete the writing in one long push over a weekend.
    梅勒德莱斯则首先着手调研,写出报告大纲,然后,在周末一鼓作气完成写作。
  • Some prediction methods used in Shengli Yellow River Bridge are introduced here, such as experiential statistics method, criterion proofread method, Push-over method and quantitative and qualitative analysis for huge span bridge.
    以胜利黄河公路大桥为例,介绍了经验统计法、规范校核法、pushover方法、大跨度桥梁定性和定量分析等桥梁震害预测方法。
  • Secondly, after experiencing the failure to push over Yuan's rule by law, he recognized more clearly the reactionary nature of Yuan Shi-kai and finally started fighting against Yuan by force to safeguard the republic.
    其次,在经历了法律倒袁失败之后,对袁的反动本质有了进一步的认识,终于开始了武力讨袁、维护共和的英勇斗争。
  • I think we are going to make a strong push over the second half of the season.
    我们队打算在常规赛下半程迎来反弹。
  • A simplified method for calculation of elastic-plastic inter-story drift ratio of slab-column structure is proposed, and it coincides well with the results by push-over method. 4.
    提出的板柱结构抗震弹塑性层间位移角简化计算方法,与pushover计算结果符合较好。
  • Basic features of the method are non linear static analysis ( i.e., push over analysis), transformation between multi degree of freedom system ( MDOF) and single degree of freedom system ( SDOF), and seismic demand curve in the form of acceleration displacement spectrum.
    该方法采用了振型分解法建立的多自由度体系和等效单自由度体系之间的转换关系,以及由现行《建筑抗震设计规范》的反应谱曲线建立的结构抗震要求曲线。
  • And the results calculated are verified by non-linear static push-over analysis method, the structural performance is checked through the lateral carrying capability, ductility and the order of plastic hinge.
    并利用静力弹塑性pushover分析方法对设计结果进行校核,通过结构的抗侧能力、塑性铰出现的顺序来考察结构的抗震性能。
  • To organise its global push over the past decade, CDB designated each of its branches as having responsibility for a different part of the world.
    过去十年,为了实施其全球扩张,国开行指定每个分行负责世界上一个地区。